
Retrofit Solar and Battery Site Plans, SLD’s and Structural Engineering
Solar Plans Canada now offers full structural engineering services tailored for residential retrofit solar building permit applications. This service includes the preparation of a Schedule-B letter, an insurance certificate, elevation drawings, solar attachment details, rail layout plans, and digitally stamped and sealed documents for online-only permit applications. Our detailed shop drawings, combined with elevation drawings, solar attachment, and rail layout, ensure precise fabrication and installation, meeting all structural and regulatory standards. These comprehensive services are designed to minimize delays and facilitate a smoother, more efficient approval process.
Key Features
Custom Site Plans
Detailed layouts specific to each project, ensuring safety and approval readiness
Single Line Diagrams (SLDs)
Essential for utility applications and permits, clearly depicting electrical pathways.
Fast Turnaround
Initial plansets within 72 hours; revisions within 48 hours.
High Acceptance Rate
Minimize costs and stress with a high first-time acceptance rate and unlimited revisions at $50 each.
Prepare for Your Order
Please prepare your solar roof layout and gather the following documents for upload: product datasheets, architectural drawings, rough site plans, and draft single-line diagrams (which can be simplified).
For an efficient process, create a rough site plan that marks the electrical components: use a snapshot from Google Earth and indicate the locations of the Electricity Meter, Main Breaker Panel, any sub-panels, solar disconnects, inverters (if string), Batteries, and BMS (if
applicable). Include voltage and amperage details for each device, aiming for accuracy, especially for commercial projects.
You do not need to specify wire sizes; we handle those calculations. However, if necessary, mention wire sizes and the number of conductors (rather than conduit types like EMT & TECK90), as this simplifies Utility approval.
For City Building permit applications, ensure structural engineering is completed before placing your order. Attach your structural report, ensuring it complies with roof setbacks and includes a penetration diagram. We will incorporate this information into the drawings accordingly. Ground-mounted systems are also included in the below pricing.

Full Site plan & SLD (Permit Package) for Residential Solar Only- Simple Net-metering- Retrofit Price $300.00 plus 5% tax (GST)
Even if you don’t need this usually for net-metering applications,
it still speeds up your building and electrical permit applications. It’s also good to print for your installers during their install process.
Need revisions? Click here.
Full Site plan & SLD (Permit Package) forResidential Solar with Batteries- Complex Net-metering- Retrofit Price $550.00 plus 5% tax (GST)
Need revisions? Click here.
Get Started
Before you purchase, please upload the relevant required documents. These help us understand your project details and ensures we can provide you with accurate site plans and Single Line Diagrams.
Permit Packages include the following complete services:
Site Plans:- General location map of the building, azimuth & orientation of each roof aspect, Roof attachment layout for point loading, side Elevation drawings, attachment to roof and rail shop drawings, full list & location of all electrical equipment on site.
Single Line Diagrams (SLD's):- Line diagram of electrical equipment, full inverter string design, string diagram and string configuration, inverter selection, inverter sizing, 125% solar breaker calculation for main breaker panel, voltage drop calculations, selection of disconnects, circuit breakers, correct wire sizes, length of cable runs, full list of relevant code rules and custom designed warning labels for each set of drawings.
Optional Structural Engineering (priced separately):- Full Schedule-B, letter of assurance, insurance certificate, shop drawings and elevation drawings (if required), digital or hard copy submission (depending on the local requirements of your durisdiction). Full assessment of structural loading using truss/rafter diagrams and architectual drawings.
Structural Engineering (Schedule-B) Sign-off for Retrofit Residential Solar Building Permit Applications Price $1200 plus 5% tax (GST)
Need revisions? Click here.

View Sample Engineering PDFs

Turnaround Time Disclaimer
Please note that our stated turnaround times of 72 hours for initial plansets and 48 hours for revisions refer to working business days. This timeframe does not include weekends or public holidays. While we strive to meet these deadlines consistently, unforeseen circumstances may occasionally cause delays. We appreciate your understanding and patience
National
• Hydro One
• TransCanada
Alberta
• ATCO Ltd and Canadian Utilities Ltd
• AltaLink
• ENMAX Corporation
• EPCOR Utilities Inc.
• FortisAlberta
British Columbia
• BC Hydro
• FortisBC
Manitoba
• Manitoba Hydro
New Brunswick
• NB Power
Newfoundland and Labrador
• Newfoundland and Labrador Hydro
• Newfoundland Power
Nova Scotia
• Nova Scotia Power
Ontario
• Hydro One
• Toronto Hydro
• Alectra Utilities
• Ontario Power Generation (OPG)
Serving Utilities Across Canada
Here's a comprehensive list of electricity companies in Canada by province that we offer our services for:
Prince Edward Island
• Maritime Electric
Quebec
• Hydro-Québec
Saskatchewan
• SaskPower
Territories
• Northwest Territories Power Corporation (NTPC)
• Yukon Energy Corporation
• Qulliq Energy Corporation